News

CERRO OTTO’S CABLEWAY GUARANTEES ITS SAFETY WITH IPH STEEL WIRE ROPES

Cerro Otto`s cableway, one of the most important attractions in Bariloche, has announced that two support lifting cables will be replaced, in order to guarantee its cable cars operations safety.

In May, after a deep assessment and technical advice from INTI`s specialists, it was decided to replace the two steel wire ropes.

As a historical supplier, IPH manufactured two reels of 2.60 m diameter for Cerro Otto with 15 tons of galvanized steel core wire and compacted, of a 38 mm diameter and 2100 meters length, each.

IPH. EVOLUTION AS AN ATTITUDE.

UPCOMING EVENTS

These will be the next exhibitions where you can find IPH. We look forward to meeting you there:


OIL AND GAS - BRAZIL
OIL AND GAS - BRAZIL

September 21-24


NAEC FALL CONVENTION – UNITED STATES
NAEC FALL CONVENTION – UNITED STATES

September 28 – October 1


AOG PATAGONIA 2026
AOG PATAGONIA 2026

October 19 - 22
Espacio DUAM, Neuquén, Argentina.